Ringling Museum
|

Public/Private Client:
Completion Date:
Location: Sarasota, Florida
Construction Cost:
Role in Project: Principal
Architect: MLD Architects, Inc.
Consultant:
Project Manager:
This project included
repairing, restoring and painting rusted and leaking steel casement stained
glass windows and doors. Exterior window and door joints, perimeters and
glazing were sealed.
The project also
included the repair and sealing of voids in grout joints, window casement
perimeters, and terra cotta architecture elements to stucco surfaces.
Replacement of joint sealants in counterflashing reglets, stone tile pavers,
roof flashings, and roof repairs.
Removal of ornamental
column and floor finishes on the west elevation of Ca' D'Zan courtyard
room. Cutting out, removing, repairing and replacement of deteriorated
reinforcing steel and cracked structural concrete throughout basement and
courtyard structural columns and arches, and reinstalling original
ornamental marble finishes on columns and floor.
All work of
this project complies with the Secretary of Interiors' Standards for
Rehabilitation of Historic Buildings and was review by the Florida
Department of State Historic Preservation Architect.
Waterproofing, Roof
and Window Repairs.
Repair and paint rusted areas of steel casement windows and doors, seal
exterior window and door joints and glazing.
Repair and seal voids in grout joints, window casement perimeters, and
terra cotta architecture elements to stucco surfaces.
Replace joint sealants in counterflashing reglets, stone tile pavers,
and roof flashings.
|